Green Road, Penistone, Barnsley

The Project:

The remediation of a 5.8Ha former steel works for residential development.

The Problem:
  • Hydrocarbon and asbestos contamination identified in the deeper areas of made ground.
  • Critical topographic and geotechnical issues including an 8 metre high rock face, reinforced machine bases and underground impediments to the proposed development.
  • Demolition of a radiographic NDT building with 2.5 metre thick reinforced walls and doors weighing in excess of 100 tonnes.
The Solution:

Urban Regen's site preparation strategy included:
  • Removal of all man-made impediments, involving the excavation of reinforced concrete and significant deposits of slag to 7.5m below EGL.
  • Removal and reprocessing for re-use within the works of 28,000m of concrete.
  • Excavation and re-engineering of 70,000m2 of made ground and natural soils/rock.
  • Changes to the topography to mitigate the costs of the follow on retaining structure to the weak rockface at the boundary.

Scroll over thumbnails for larger image
scroll over thumbnails for larger image

The Benefits:
  • The Developer benefited from the surety of our fixed price package, which covered the removal of additional volumes of concrete and significant buried structures beneath the intended foundations.
  • An increased amount of engineering materials were made available for the development stage.
  • Urban Regen met challenging issues with numerous uncharted services, undertook considerable changes to the scope of works including an increase to final contours, all within the original programme.
  • Through close liaison with the Developer and their Environmental Consultant, the project was achieved within the fixed price agreed.