Case Studies 1/3 Previous Page
Milton Mills, Mossley, Manchester

The Project:

The remediation of a 6.8Ha former cotton and woollen mill site for residential development.


The Problem:
  • The existing access bridge to the majority of the site had a 1 tonne weight limit.
  • Deposits of made ground (up to 8.4m deep) comprised ash, clinker, relic foundations, Fuller's Earth and localised arsenic, heavy metal, PAH and asbestos impacted soils, overlying a shallow acquifier with shallow groundwater in continuity with adjacent watercourses.
The Solution:
  • Installation of temporary bridge abutments and associated Bailey Bridge to effect access to the larger portion of the site.
  • Widespread treatment of Japanese Knotweed and Himalayan Balsam.
  • Excavation and disposal of Fuller's Earth under strict management regime to prevent off-site environmental nuisance.
  • Isolation and removal of hydrocarbon and asbestos impacted soils.
  • Removal and reprocessing of relic foundations.
  • Re-engineering of made ground to provide an alternative raft foundation solution in certain areas.
  • Full geological validation of plot and road areas to verify foundation proposals and carriageway design, undertaken by our external Geological Consultant.
  • Re-profiling and raising of site levels for flood mitigation and plot development purposes.
  • Full ground water and gas monitoring to verify post remediation characteristics.
  • Additional slope stability analysis where proposed infrastructure works were in close proximity to the existing river course.
  • Riverside erosion protection works.
  • Preparation of service corridors through the re-engineered made ground to mitigate the developer's post remediation liabilities.
  • Installation of phased infrastructure works post remediation.
  • Full environmental and geotechnical validation, completion reporting and phased Regulator sign off, to release areas of the site for early development.

Scroll over thumbnails for larger image
scroll over thumbnails for larger image

The Benefits:
  • Working in close liaison with the Developers and the Regulators, Urban Regen's fully comprehensive remediation services ensured that the project and final development costs were minimised.
  • The project was completed in line with the Developer's build programme.
  • Impact on the local community was minimised.